SpecGuard

Construction submittal review
Back to recent runs
COMPLETED SAMPLE

Run 669386b6

This run was audited before submittal numbers were assigned, so it is identified by its run ID.

Created 2026-08-22 22:27:46.023483+00:00

Claims made
1
Findings persisted
1
Rejected
0
Retried
0
Open the RFI draft PDF Export this run as JSON

The JSON export carries findings, rejections, integrity records, document hashes, severity, token usage, and timestamps. It carries no filesystem path and no passphrase.

Audit model usage

Exact Gemini token counts from ADK metadata. SpecGuard does not estimate missing counts.

Prompt tokens
9729
Output tokens
223
Total tokens
10996

Tool calls the model initiated

Every tool call the model itself initiated, in the order it made them, as the ADK event stream reported them. A call the runtime made to build the message is not a model decision and is not listed here.

This run recorded no model-initiated tool call. In full_text mode both documents are sent up front, so the model can return its claims without reading more; when it does call a read-only tool such as verify_quote to check its own quote, that call is listed here.

Findings QUOTES VERIFIED

Both quotes were found at their cited pages. This is not a judgment that the discrepancy is real.

StatusClaimSpecification quote in contextSubmitted quote in contextSeverity
QUOTES VERIFIEDThe specification requires a 480V, 3-phase distribution switchboard, but the submitted cut sheet specifies a 208V nominal system.Specification page 3Provide a 480V, 3-phase distribution switchboard for service distribution.
Specification page 3, as the gate read it

…arning workshop · project no. alw-2026-e01 division 26 · electrical section 26 24 13 · low-voltage distribution switchboards part 2 · products 2.1 service distribution assembly a. provide a 480v, 3-phase distribution switchboard for service distribution. b. provide a 4-wire solidly grounded system with a full-size neutral bus. c. provide copper bus braced for the available fault current shown on the drawings. d. provide main and f…

Submitted page 1Nominal system: 208V, 3-phase, 4-wire.
Submitted page 1, as the gate read it

…ew is complete. sec 1 lugs sec 2 lugs sec 3 lugs 2. electrical ratings & operating parameters specification parameter submitted ratings & equipment characteristics electrical data nominal system: 208v, 3-phase, 4-wire. bus arrangement copper main bus with full neutral and ground bars. short-circuit rating selected during engineered configuration for the application. main protective device molded…

UNCLASSIFIEDfallback

Reason: severity endpoint not deployed outside demo windows

Severity is an advisory Gemma annotation on already-verified findings. It is not part of verification.

Each shaded block is the cited page as the gate read it: extracted with PyMuPDF, then normalized by the gate's own normalizer, and bounded to a window either side of the quote. The highlighted run is the exact text the gate matched. Run the same check yourself.

Rejections REJECTED

Claims the gate refused, with the exact reason code it returned.

No claims were rejected for this run.

Integrity records QUARANTINED

Hidden text found in the document text layer. No model read this text.

No text-layer integrity record exists for this run.

Chain-of-custody metadata

The hex run ID and the SHA-256 of every source and generated file, in full. These identify the byte streams this run read and wrote. They are chain-of-custody metadata only. They do not prove accuracy, and no part of the verification gate reads them.

Run ID
669386b6384e4ab6aad9f2ee5263db5a
RoleObjectSHA-256
specification669386b6384e4ab6aad9f2ee5263db5a/specification.pdf88988353d0332a32c3dcdf47225e150814a92277beb920cdfc919de9d3dfe568
submitted_document669386b6384e4ab6aad9f2ee5263db5a/submitted-document.pdf8c3109b8ef690dd2c51de6fa3efacedcdbc6da6df582c138c504f82b2155a385
RFI669386b6384e4ab6aad9f2ee5263db5a/rfi.pdf91c9e65a732aaa1b99ee8460d1b651d2bcd7cef44edff6550dbd479aed7cb3e5